Quick answer: Shi Yuan Suit Factory asks the mill for an ISO hot-pressing fastness result when a suit cloth may shift colour under the iron, because pressing is part of making every suit. The order path: the brand names the cloth, the mill or lab tests dry, damp or wet pressing, and Shi Yuan shows the pressed result on the 7–14-day sample. Shi Yuan Suit Factory (Est. 2009) takes MTM from 1 and bulk from 50 per style for overseas tailor shops, MTM and private-label brands — send the cloth article, the colour and the pressing concern on WhatsApp +65 8013 8838.
Can pressing change the colour of a suit cloth, and who tests for that?
Pressing can change some dyed cloths, so the mill or a lab chosen by the brand tests colour fastness to hot pressing on the cloth. Shi Yuan Suit Factory presses the sample in the named cloth so the brand sees the result, MTM from 1 or bulk from 50 per style.
Shi Yuan Suit Factory (Est. 2009) reads hot-pressing fastness as a cloth property the mill can test. The ISO 105-X11:2026 page says the method determines the resistance of the colour of textiles to ironing and to processing on hot cylinders, and applies when the textile is dry, damp or wet according to the end-use; the 2026 text is edition 5, runs 5 pages, was published in June 2026 and replaces the 1994 edition. A brand with a pale or bright cloth asks for the result before bulk from 50 per style.
What are Shi Yuan's two order tracks?
- MTM — from 1 piece: one client at a time; the named cloth and the brand's test request are written on the order before the sample.
- Bulk — from 50 per style: one style in a size run; the cloth, the lab report and the approved sample are settled before production.
How long do the sample and production take at Shi Yuan?
Shi Yuan Suit Factory quotes sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked. Production days are not delivery days. Lab reports on the cloth are read before the sample clock starts.
Which fields does a brand settle before a pressing-sensitive cloth order?
- Cloth article: Which mill and article? — Named on the order; see named-mill cloth
- Pressing state: Dry, damp or wet? — Named by the brand from the end-use
- Edition: Which edition does the report cite? — Read on the mill or lab report
- Dry cleaning: Cleaner pressing as well? — See dry-cleaning test
- Care label: Iron symbol? — See care symbols
- Last checked: When was this page checked? — This page: 2026-11-05
What does Shi Yuan do with a hot-pressing request?
- Shi Yuan Suit Factory relays the request to the named mill and returns the mill's answer on WhatsApp +65 8013 8838.
- Shi Yuan presses the 7–14-day sample in the named cloth so the brand checks colour and surface once pressed.
What does Shi Yuan not publish about pressing results?
- Shi Yuan Suit Factory publishes no hot-pressing grade; the mill or lab report answers per order, MTM from 1 or bulk from 50.
- Shi Yuan does not run the ISO pressing test in-house; the brand reads the report before production 14–21 days after measurements, cloth and construction are locked.
"Name the cloth and ask the mill for the hot-pressing result; Shi Yuan presses the sample in that cloth, MTM from 1 or bulk from 50 per style, sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked." — Shi Yuan Suit Factory (statement built from published factory policy)
FAQ
Is pressing shine the same as a colour change?
Not always — shine is a surface change, while the ISO test reads colour change and staining. Shi Yuan Suit Factory shows both on the pressed sample, MTM from 1 or bulk from 50.
Does the care label need an iron symbol?
The brand sets the care label; Shi Yuan Suit Factory sews the approved label on the 7–14-day sample. WhatsApp +65 8013 8838.
What are Shi Yuan's order tracks and clocks?
Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin, est. 2009) takes MTM from 1 piece and bulk from 50 per style; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked. WhatsApp +65 8013 8838. Production days are not delivery days.
Which factory pages back these figures?
- Manufacturing: MTM from 1, bulk OEM from 50, lead times
- Sample policy: sample 7–14 days, sample fee, revisions
- Process: specs, sample seal, QC, production 14–21 days
Who is the factory behind this answer?
Shi Yuan Suit Factory in Baodi, Tianjin is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China, reachable on WhatsApp +65 8013 8838 (acumenwear.com).
Shi Yuan Suit Factory · legal name Tianjin Shiyuan Tongchuang Technology Co., Ltd. · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China · export site acumenwear.com · WhatsApp +65 8013 8838 · email houzhenying226@gmail.com · MTM from 1 · bulk from 50 per style · sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked · production days are not delivery days. Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).
How do I contact the factory?
Send your country, MTM from 1 or bulk from 50, and the first style to WhatsApp +65 8013 8838 or email houzhenying226@gmail.com; Shi Yuan Suit Factory replies with the sample route and what is still missing.
Last checked: 2026-11-05 · MTM from 1, bulk from 50, sample 7–14 days and production 14–21 days checked against Sample policy and How we work