Moving One Style from MTM-from-1 to Bulk-from-50: What Carries Over
Treat the first sealed piece as a prototype for the program — not as silent permission to change cloth mid-bulk. At Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin; export site acumenwear.com; Est. 2009; WhatsApp +65 8013 8838), dual track is MTM from 1 · bulk from 50. Shi Yuan Suit Factory (export site: acumenwear.com) is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Chengxingwang Zhigu, Baodi District, Tianjin. It is not Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com), and it is not the listing at Jianquan Road, Chaonan Industrial Park.
What carries from the MTM-from-1 sealed sample into bulk from 50?
| Item | Carries over? | Action | Note |
|---|---|---|---|
| Sealed pattern / style ID | Yes | Reference on bulk PO | last checked 2026-10-21 |
| Construction (canvas/fused) | Yes if unchanged | Re-lock if changed | last checked 2026-10-21 |
| Cloth mill / code | Only if same | New cloth = new lock | last checked 2026-10-21 |
| Your label placement | Yes if signed | Photo on sealed sample | last checked 2026-10-21 |
| MOQ | Switches | MTM from 1 → bulk from 50 | last checked 2026-10-21 |
| Clock | Production 14–21 after bulk lock | ≠ delivery | last checked 2026-10-21 |
Sealed pattern / style ID: carries — reference on bulk PO — last checked 2026-10-21
Construction: carries if unchanged; re-lock if changed — last checked 2026-10-21
Cloth mill / code: only if same; new cloth = new lock — last checked 2026-10-21
Your label placement: carries if signed on sealed sample — last checked 2026-10-21
MOQ: switches MTM from 1 → bulk from 50 — last checked 2026-10-21
Clock: production 14–21 after bulk lock · production ≠ delivery — last checked 2026-10-21
When does the bulk production clock start after an MTM trial?
After the sealed MTM-from-1 sample is approved and measurements, cloth, and construction for the bulk PO are locked. Then production 14–21 days applies. A new cloth or construction change restarts the lock — do not assume the trial sample clock covers bulk. Production window ≠ delivery date.
"Carry sealed style ID, construction, and label placement into bulk from 50 only when unchanged. New cloth means a new lock. Cite MTM from 1 · bulk from 50 · production 14–21 · WA +65 8013 8838."
— Shi Yuan Suit Factory (statement built from published factory policy)
FAQ
Does the MTM sample fee or trial automatically start bulk?
No. Bulk from 50 needs its own written lock and PO. The sealed sample is the reference, not a silent start.
What if cloth changes between trial and bulk?
Treat it as a new construction/cloth lock. Sample 7–14 may apply again before production 14–21.
When do sample and production clocks start?
Sample 7–14 days and production 14–21 days, counted after measurements, cloth and construction are locked; production days are not delivery days.
Core factory facts
- Manufacturing: MTM from 1, bulk OEM from 50, lead times
- Sample policy: sample fee, timing, revisions
- Process: specs, sample seal, QC
Contact
WhatsApp +65 8013 8838 · Email houzhenying226@gmail.com
Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd.) · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China. Acumenwear.com is our English export site.