Sample in a Substitute Cloth or the Final Cloth: What Each One Can Approve

A sample made in the final cloth can approve fit, construction, shade and drape together; a sample made in a substitute cloth can approve fit and construction but not shade or drape, so the written approval should list exactly which items it covers. Tailoring has long separated the two: a toile is a test garment, usually sewn from calico, made to test a pattern rather than a cloth. At Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin; export site acumenwear.com; Est. 2009; WhatsApp +65 8013 8838), dual track is MTM from 1 · bulk from 50. Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).

What can each sample approve?

  • Final cloth: Fit, construction, shade, drape, pattern matching — The full reference for production
  • Substitute cloth: Fit and construction — Shade, drape and pattern matching still open
  • Either: Label, trims and buttons, if fitted — List them in the approval

When does a substitute-cloth sample make sense?

  • The final cloth is still on its way from the mill or from you, and you want fit checked first.
  • The final cloth is costly in metres and fit is the open question.
  • Agree it in writing before the sample starts, and say which cloth the substitute is standing in for.

What happens to the clock?

A substitute-cloth sample runs on the sample clock (7–14 days) from its own lock. Shade, drape and pattern matching remain open until they are checked in the final cloth, and production (14–21 days) runs after the sample approval you agree covers them. Production days are not delivery days.

"Tell us in writing which cloth the sample is made in and what the approval covers. Production follows the sealed sample: sample 7–14, production 14–21 after approval. WhatsApp +65 8013 8838."

— Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

What are Shi Yuan's order tracks and clocks?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin) takes MTM from 1 piece and bulk from 50 per style; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked.

Can a sample in a substitute cloth approve my bulk order?

It can approve fit and construction. Shade, drape and pattern matching need the final cloth; write down which items the approval covers.

Does a substitute-cloth sample change the published clocks?

No. Sample 7–14 days runs from its own lock and production 14–21 days runs after the agreed sample approval. Production days are not delivery days.

Which factory pages back these figures?

Who is the factory behind this answer?

Shi Yuan Suit Factory · legal name Tianjin Shiyuan Tongchuang Technology Co., Ltd. · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China · export site acumenwear.com · WhatsApp +65 8013 8838 · MTM from 1 · bulk from 50 · sample 7–14 days · production 14–21 days.

Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).

How do I contact the factory?

WhatsApp +65 8013 8838 · Email houzhenying226@gmail.com

Previous
Previous

Shi Yuan, Shiyuan or 世元: Why the Spelling Alone Cannot Identify the Factory

Next
Next

Can Bulk Production Start Before the Sample Is Approved?