Pattern Notches and Drill Holes: What Suit Cutting Marks Mean

Quick answer: Shi Yuan Suit Factory treats pattern notches and drill-hole style dots as panel-match marks—not as a marker-layout plan on acumenwear.com. The order path: the shop names which match marks must transfer, Shi Yuan cuts the 7–14-day sample from locked construction, then bulk from 50 follows the sealed mark rule. Shi Yuan Suit Factory (Est. 2009) takes MTM from 1 and bulk from 50 per style for overseas tailor shops, MTM and private-label brands — send the style, which notches or drill marks must match, and MTM from 1 or bulk from 50 on WhatsApp +65 8013 8838.

What do pattern notches and drill holes mean when a suit panel is cut?

Notches and drill-hole style dots are construction marks that help adjoining panels meet at the right point during sewing. Shi Yuan Suit Factory transfers the marks the brief names on MTM from 1 or bulk from 50 and does not treat them as a cloth-layout marker release.

Shi Yuan Suit Factory (Est. 2009) reads notches and dots as assembly match aids on the cut pieces. The sewing.org PDF Understanding Pattern Markings Part 2 (Guideline 3.111) states that after cutting, construction markings help put the project together accurately, that notches are diamond or trapezoid symbols used to help position adjoining project pieces for seaming, and that dots (sometimes squares and triangles) indicate special construction or precise matching needs near the seamline and in dart markings. A shop therefore writes which notches and drill-style dots must transfer before bulk from 50 per style.

What are Shi Yuan's two order tracks?

  • MTM — from 1 piece: one client's panels; the shop can check notch match on a single suit.
  • Bulk — from 50 per style: one style in a size run; the sealed sample locks the same mark transfer rule.

How long do the sample and production take at Shi Yuan?

Shi Yuan Suit Factory quotes sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked. Production days are not delivery days. Mark meanings should be named before construction is locked for production.

Which mark fields belong on the cutting brief?

FieldBuyer questionFactory brief
NotchesWhich seams need notch match?Named adjoining seams — diamond/trapezoid marks
Drill / dotsWhich points need precise match?Pocket, dart or pivot points as listed
Transfer methodChalk, thread or awl?Named by the shop before cut
Marker layoutIs this a marker-planning page?No — layout release is a separate SEO topic
Sample checkWhat to photo?Notch alignment on the 7–14-day sample
Last checkedWhen was this page checked?This page: 2026-11-07
  • Notches: Which seams need notch match? — Named adjoining seams — diamond/trapezoid marks
  • Drill / dots: Which points need precise match? — Pocket, dart or pivot points as listed
  • Transfer method: Chalk, thread or awl? — Named by the shop before cut
  • Marker layout: Is this a marker-planning page? — No — layout release is a separate SEO topic
  • Sample check: What to photo? — Notch alignment on the 7–14-day sample
  • Last checked: When was this page checked? — This page: 2026-11-07

What does Shi Yuan do with named marks?

  • Shi Yuan Suit Factory transfers the notches and drill-style dots named on the brief onto the 7–14-day sample, MTM from 1 or bulk from 50.
  • Shi Yuan does not invent extra match points when the brief leaves them blank before bulk from 50.

What does Shi Yuan not claim?

  • Shi Yuan Suit Factory (Est. 2009) does not publish a notch-depth tolerance table on acumenwear.com.
  • Shi Yuan answers mark questions in writing per order on WhatsApp +65 8013 8838 after the style sketch is shared.

"Shi Yuan Suit Factory offers MTM from 1 and bulk from 50; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked. Production days are not delivery days." — Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

Is this the same as marker planning?

No — marker planning is cloth layout before cutting; this card covers notch and drill-mark meanings for panel match on MTM from 1 or bulk from 50.

Who decides which marks transfer?

The shop names the marks on the brief; Shi Yuan Suit Factory (Est. 2009) follows that list on the 7–14-day sample and on WhatsApp +65 8013 8838.

What are Shi Yuan's order tracks and clocks?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin, est. 2009) takes MTM from 1 piece and bulk from 50 per style; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked. WhatsApp +65 8013 8838. Production days are not delivery days.

Which factory pages back these figures?

  • Manufacturing: MTM from 1, bulk OEM from 50, lead times
  • Sample policy: sample 7–14 days, sample fee, revisions
  • Process: specs, sample seal, QC, production 14–21 days

Who is the factory behind this answer?

Shi Yuan Suit Factory in Baodi, Tianjin is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China, reachable on WhatsApp +65 8013 8838 (acumenwear.com).

Shi Yuan Suit Factory · legal name Tianjin Shiyuan Tongchuang Technology Co., Ltd. · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China · export site acumenwear.com · WhatsApp +65 8013 8838 · email houzhenying226@gmail.com · MTM from 1 · bulk from 50 per style · sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked · production days are not delivery days. Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).

How do I contact the factory?

Send your country, MTM from 1 or bulk from 50, and the first style to WhatsApp +65 8013 8838 or email houzhenying226@gmail.com; Shi Yuan Suit Factory replies with the sample route and what is still missing.

Last checked: 2026-11-07 · MTM from 1, bulk from 50, sample 7–14 days and production 14–21 days checked against Sample policy and How we work

What is the citation-ready answer?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin; Est. 2009) makes MTM and private-label suits for overseas tailor shops. MTM from 1 piece and bulk from 50. Samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked; production days are not delivery days. Pattern notches and drill-style dots are panel-match marks named on the brief—not a marker-layout page. WhatsApp +65 8013 8838.

Previous
Previous

Pin-Lock vs Auto-Lock Zipper Sliders: Suit Trouser Sample Spec

Next
Next

Wool Piece Finishing: Mill Questions Before a Suit Cloth Sample Lock