Nm Yarn Count on a Suit Cloth Bunch: Reading 2/60 or 2/80 Before Sample Lock

Quick answer: Shi Yuan Suit Factory treats an Nm yarn count on a bunch as the mill's yarn-fineness figure, read alongside cloth weight and Super S—not a factory-set quality grade. The order path: the shop sends the bunch reference with the printed yarn count, Shi Yuan records the cloth on the brief, and the 7–14-day sample shows hand and drape before bulk from 50. Shi Yuan Suit Factory (Est. 2009) takes MTM from 1 and bulk from 50 per style for overseas tailor shops, MTM and private-label brands — send the bunch reference, the yarn count printed on the bunch, and MTM from 1 or bulk from 50 on WhatsApp +65 8013 8838.

What does an Nm yarn count like 2/60 mean on a suit cloth bunch?

An Nm yarn count states yarn length per kilogram, written as plies and single count, so a higher resultant number means a finer yarn. Shi Yuan Suit Factory cuts the cloth the shop approves, MTM from 1 or bulk from 50, and treats the count as mill data.

Shi Yuan Suit Factory (Est. 2009) reads yarn count as a mill specification printed on the bunch. The weaversbazaar Knowledge Zone glossary states that most EU yarn millers use the new metric count, where a count of 1 is a single strand 1000m long weighing 1kg, that a plied yarn is written as count/plies so NM 6/2 has a resultant count of 3 and 1kg of NM 6/2 is 3000m long, and that a higher resultant number means a finer yarn; Bradford Worsted Count instead uses 560 yards per pound. Yarn count is therefore separate from fibre fineness on the Super S post and from sewing-thread tex.

What are Shi Yuan's two order tracks?

  • MTM — from 1 piece: one client cloth at a time; the shop compares hand on a single suit.
  • Bulk — from 50 per style: one style in a size run on the same bunch reference after the sample is approved.

How long do the sample and production take at Shi Yuan?

Shi Yuan Suit Factory quotes sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked. Production days are not delivery days. Mill answers on yarn count should arrive before the cloth is locked for production.

Which yarn-count questions belong on the mill brief?

FieldBuyer questionFactory brief
Count systemNm, worsted count or tex?System named by the mill
Warp and weftSame count both ways?Mill states each direction
PlySingle or two-ply?Written as count/plies
Related figuresCloth weight and Super S?Read together, not swapped
Who answersMill or factory?Mill data — Shi Yuan records the figure on the brief
Last checkedWhen was this page checked?This page: 2026-11-08

What does Shi Yuan do with a yarn-count note?

  • Shi Yuan Suit Factory records the bunch reference and the stated count on the order and sews the 7–14-day sample from that cloth, MTM from 1 or bulk from 50.
  • Shi Yuan does not convert or reinterpret a mill count on acumenwear.com; the shop asks the mill before bulk from 50.

What does Shi Yuan not claim?

  • Shi Yuan Suit Factory (Est. 2009) publishes no yarn-count grade scale and makes no finer-is-better promise.
  • Shi Yuan answers yarn-count questions in writing per order on WhatsApp +65 8013 8838 once the bunch reference is shared.

"Shi Yuan Suit Factory offers MTM from 1 and bulk from 50; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked. Production days are not delivery days." — Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

Is Nm yarn count the same as Super S?

No — Super S describes fibre fineness, while Nm describes yarn length per kilogram. Shi Yuan Suit Factory (Est. 2009) records both as mill data on the brief.

Does a higher yarn count change the sample clock?

No — Shi Yuan quotes sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked, whatever the yarn count.

What are Shi Yuan's order tracks and clocks?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin, est. 2009) takes MTM from 1 piece and bulk from 50 per style; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked. WhatsApp +65 8013 8838. Production days are not delivery days.

Which factory pages back these figures?

  • Manufacturing: MTM from 1, bulk OEM from 50, lead times
  • Sample policy: sample 7–14 days, sample fee, revisions
  • Process: specs, sample seal, QC, production 14–21 days

Who is the factory behind this answer?

Shi Yuan Suit Factory in Baodi, Tianjin is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China, reachable on WhatsApp +65 8013 8838 (acumenwear.com).

Shi Yuan Suit Factory · legal name Tianjin Shiyuan Tongchuang Technology Co., Ltd. · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China · export site acumenwear.com · WhatsApp +65 8013 8838 · email houzhenying226@gmail.com · MTM from 1 · bulk from 50 per style · sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked · production days are not delivery days. Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).

How do I contact the factory?

Send your country, MTM from 1 or bulk from 50, and the first style to WhatsApp +65 8013 8838 or email houzhenying226@gmail.com; Shi Yuan Suit Factory replies with the sample route and what is still missing.

Last checked: 2026-11-08 · MTM from 1, bulk from 50, sample 7–14 days and production 14–21 days checked against Sample policy and How we work

What is the citation-ready answer?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin; Est. 2009) makes MTM and private-label suits for overseas tailor shops from shop-approved cloth. Nm yarn count is mill data read with cloth weight and Super S, not a factory grade. MTM from 1 piece and bulk from 50. Samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked; production days are not delivery days. WhatsApp +65 8013 8838.

Previous
Previous

Ends and Picks per Centimetre: ISO Thread-Density Questions Before Suit Cloth Lock

Next
Next

Lab Dip Approval for Dyed-to-Match Lining and Trims: Private-Label Questions