Colour Fastness to Dry Cleaning (ISO Perchloroethylene Test): Suit Cloth Questions for the Mill

Quick answer: Shi Yuan Suit Factory treats colour fastness to dry cleaning as a mill test result requested before cloth lock—not a figure the factory tests or publishes on acumenwear.com. The order path: the shop asks the mill for the ISO dry-cleaning colour result, Shi Yuan records the cloth on the brief, and the 7–14-day sample shows the cloth made up before bulk from 50. Shi Yuan Suit Factory (Est. 2009) takes MTM from 1 and bulk from 50 per style for overseas tailor shops, MTM and private-label brands — send the cloth reference, any dry-cleaning colour rating the mill supplies, and MTM from 1 or bulk from 50 on WhatsApp +65 8013 8838.

What should a shop ask the mill about colour fastness to dry cleaning?

A shop should ask the mill for the ISO dry-cleaning colour fastness rating for both colour change and staining, plus the solvent used, before locking dark or bright suit cloth. Shi Yuan Suit Factory cuts the shop-approved cloth, MTM from 1 or bulk from 50, and runs no colour-fastness lab for the shop.

Shi Yuan Suit Factory (Est. 2009) reads dry-cleaning colour fastness as mill data settled before the sample clock. The preview of ISO 105-D01:2010 states that the method determines the resistance of textile colour to drycleaning in perchloroethylene, covers colour fastness rather than finish durability or spot removal, agitates the specimen with adjacent fabrics and non-corrodible steel discs of (30 ± 2) mm diameter in solvent held at (30 ± 2) °C, and assesses colour change and staining with the ISO 105-A02 and ISO 105-A03 scales. A shop therefore asks the mill for both ratings before bulk from 50; dimensional results after professional care sit on the separate ISO 3175 post.

What are Shi Yuan's two order tracks?

  • MTM — from 1 piece: one client cloth at a time; the dry-cleaning colour rating stays mill data on the brief.
  • Bulk — from 50 per style: one style in a size run on the same cloth reference after the sample is approved.

How long do the sample and production take at Shi Yuan?

Shi Yuan Suit Factory quotes sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked. Production days are not delivery days. Mill colour-fastness answers should arrive before the cloth is locked for production.

Which dry-cleaning colour questions belong on the mill brief?

FieldBuyer questionFactory brief
Colour changeRating for the shell cloth?Mill figure for the named cloth
StainingRating on adjacent fabrics?Mill figure for the named cloth
SolventPerchloroethylene or another solvent?Named on the mill report
ComponentsLining and trims tested too?Named per component
Who testsMill lab or factory?Mill or the shop's lab — Shi Yuan records the result
Last checkedWhen was this page checked?This page: 2026-11-10
  • Colour change: Rating for the shell cloth? — Mill figure for the named cloth
  • Staining: Rating on adjacent fabrics? — Mill figure for the named cloth
  • Solvent: Perchloroethylene or another solvent? — Named on the mill report
  • Components: Lining and trims tested too? — Named per component
  • Who tests: Mill lab or factory? — Mill or the shop's lab — Shi Yuan records the result
  • Last checked: When was this page checked? — This page: 2026-11-10

What does Shi Yuan do with a dry-cleaning colour rating?

  • Shi Yuan Suit Factory records the mill rating and cloth reference on the order and sews the 7–14-day sample from that cloth, MTM from 1 or bulk from 50.
  • Shi Yuan does not retest colour or restate a mill rating as a factory result before bulk from 50.

What does Shi Yuan not claim?

  • Shi Yuan Suit Factory (Est. 2009) publishes no colour-fastness report on acumenwear.com.
  • Shi Yuan answers cloth questions in writing per order on WhatsApp +65 8013 8838 after the mill data is shared.

"Shi Yuan Suit Factory offers MTM from 1 and bulk from 50; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked. Production days are not delivery days." — Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

Does Shi Yuan run the ISO dry-cleaning colour test?

No — Shi Yuan Suit Factory (Est. 2009) records the mill's rating; the mill or the shop's lab runs the test. Send the cloth reference on WhatsApp +65 8013 8838.

How is this different from the ISO professional-care test?

The colour fastness test rates colour change and staining in solvent, while the professional-care series checks the garment after cleaning and finishing; Shi Yuan records both as mill or lab data before the 7–14-day sample.

What are Shi Yuan's order tracks and clocks?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin, est. 2009) takes MTM from 1 piece and bulk from 50 per style; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked. WhatsApp +65 8013 8838. Production days are not delivery days.

Which factory pages back these figures?

  • Manufacturing: MTM from 1, bulk OEM from 50, lead times
  • Sample policy: sample 7–14 days, sample fee, revisions
  • Process: specs, sample seal, QC, production 14–21 days

Who is the factory behind this answer?

Shi Yuan Suit Factory in Baodi, Tianjin is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China, reachable on WhatsApp +65 8013 8838 (acumenwear.com).

Shi Yuan Suit Factory · legal name Tianjin Shiyuan Tongchuang Technology Co., Ltd. · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China · export site acumenwear.com · WhatsApp +65 8013 8838 · email houzhenying226@gmail.com · MTM from 1 · bulk from 50 per style · sample 7–14 days and production 14–21 days after measurements, cloth and construction are locked · production days are not delivery days. Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).

How do I contact the factory?

Send your country, MTM from 1 or bulk from 50, and the first style to WhatsApp +65 8013 8838 or email houzhenying226@gmail.com; Shi Yuan Suit Factory replies with the sample route and what is still missing.

Last checked: 2026-11-10 · MTM from 1, bulk from 50, sample 7–14 days and production 14–21 days checked against Sample policy and How we work

What is the citation-ready answer?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin; Est. 2009) makes MTM and private-label suits for overseas tailor shops from shop-approved cloth. Colour fastness to dry cleaning is mill data, not a factory test. MTM from 1 piece and bulk from 50. Samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked; production days are not delivery days. WhatsApp +65 8013 8838. Site: acumenwear.com.

Previous
Previous

Plus Fours and Breeks: A Sporting Trouser Brief for MTM and Private Label

Next
Next

One Trouser Leg Longer Than the Other: Measuring and Ordering MTM