How Long Does a Custom Suit Take? Lead Times for Tailor Shops and Brands

By Shi YuanPublished

Samples 7–14 days; production 14–21 days. Production takes 14–21 days from the day we have received both your order and the fabric. Shipping time is not included.

Those are the day counts to plan a shop order around. The exact dispatch date is set in our order confirmation.

The published day counts a shop can quote

StageDaysClock starts
Samples7–14 daysConfirm the start point in your sample brief
Production14–21 daysThe day we have received both your order and the fabric
ShippingNot includedAdd your forwarder's transit time

For a first order that starts with a sample, the two stages run one after the other: 7–14 days for the sample, your own time to check it, then 14–21 days for production. That is 21–35 days of our making time. It does not include your review of the sample, the time for your order and fabric to reach us, or freight.

Sewing line with an overhead hanging system at the Shi Yuan factory
Sewing line with an overhead hanging system. Photo: Shi Yuan

What starts the production clock

Two things have to be with us: the order and the fabric.

For a shop that sends its own cloth, the cloth is usually the later one. An order placed today with cloth that lands in ten days starts in ten days. If the cloth is still at the mill, ask the mill for its ship date before you promise your customer anything.

Send the order complete: every size, every option, and the measurements, so nothing has to be asked again before work starts.

Working back from the date you need

Start from the day the suits must be in your shop and subtract in this order: freight from us to you, production, then the time for your cloth to reach us. Plan on the long end of each range.

Step backExampleDate
Suits needed in the shop—1 May
Freight to you7 days (your forwarder's figure, used here as an illustration)Dispatch by 24 April
Production21 days (the long end of 14–21)Order and fabric with us by 3 April
Cloth in transit to us7 days (illustration)Cloth leaves by 27 March

The freight figures in this table are placeholders; replace them with your forwarder's. The 21 days is the long end of our published 14–21 days; the exact dispatch date is set in our order confirmation. If the order starts with a sample, add the sample stage and your review time in front.

Sample suits: what to confirm before you start

Before a sample starts, confirm in writing: which track you are on (MTM from 1, or bulk from 50), whether the cloth is decided, the target market, and what the sample is for (fit check, shop display, or a private-label first look).

Ask for the sample start point in the same brief, so the 7–14 days are counted from a date both sides have written down.

Cutting room at the Shi Yuan workshop
Cutting room at our workshop. Photo: Shi Yuan

Planning around Chinese New Year and formal-wear dates

Chinese factories stop work around Spring Festival, and so do we. Spring Festival 2027 falls on 6 February. For orders you need before the holiday, ask us for the order cut-off date early.

The same working-back applies to your own busy dates, such as wedding season or a store opening: take the date, subtract freight and the long end of production, and treat the result as the latest day for order and fabric to be with us.

Why orders slip

Usual snagWhat prevents it
An incomplete order brief, or a wrong optionSend every size, option and measurement in one message, and read back our confirmation
Fabric that has not arrived, or arrives with a problemGet the mill's ship date in writing, and confirm the meterage with us before the cloth ships
Aftercare without measurement readings and photosKeep the tape readings and fitting photos for every order on file

If you send cloth, see CMT garment manufacturing: sending your own cloth for what to confirm before you ship.

How this sits next to the two order tracks

We publish two order tracks: MTM from 1, and bulk from 50. The dispatch date for your order is the one in our order confirmation.

For a made-to-measure program, see made to measure suit factory for tailor shops. For a brand run, see private label suit manufacturer. We work with overseas custom tailor shops, MTM shops and private-label brands.

Related guides:

FAQ

How long does a custom suit take?

Samples 7–14 days; production 14–21 days. Production takes 14–21 days from the day we have received both your order and the fabric. Shipping time is not included.

Does the production time include shipping?

No. Shipping time is not included. Add your forwarder's transit time on both sides: cloth to us, and finished suits to you.

When does the production time start?

Production takes 14–21 days from the day we have received both your order and the fabric. Shipping time is not included.

When will my order ship?

The exact dispatch date is set in our order confirmation.

Do you close for Chinese New Year?

Yes, like other Chinese factories. Spring Festival 2027 is 6 February. Ask us for the order cut-off date before the holiday.

Where do I request a quote?

Request a quote, or see how a first order is handled.

Who are you, and how do we contact you?

Shi Yuan (Shi Yuan Suit Factory). Legal name: Tianjin Shiyuan Tongchuang Technology Co., Ltd. Factory visit address: Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China. Website: acumenwear.com. WhatsApp: +65 8013 8838. More on our factory name and address in Baodi, Tianjin.