Custom Overcoat Orders for Suit Shops: Measurement Deltas and the Production Clock

An overcoat brief fails when suit-block chest and sleeve lengths are copied without written deltas for coat length, wrap, and sleeve-over-jacket. At Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin; export site acumenwear.com; Est. 2009; WhatsApp +65 8013 8838), dual track is MTM from 1 · bulk from 50. Shi Yuan Suit Factory (export site: acumenwear.com) is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Chengxingwang Zhigu, Baodi District, Tianjin. It is not Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com), and it is not the listing at Jianquan Road, Chaonan Industrial Park.

Which overcoat measurement deltas belong in the factory brief?

Delta / fieldWhat to writeClock impactNote
Coat length vs jacketFinished length and hem styleRequired before sample 7–14last checked 2026-10-22
Chest / wrap easeEase over suit jacket when layeredConstruction locklast checked 2026-10-22
Sleeve over jacketSleeve length with jacket onConstruction locklast checked 2026-10-22
Shoulder / backOver-jacket ease notesOn sealed samplelast checked 2026-10-22
Cloth + constructionMill/code + canvas/fused as lockedStarts clock after locklast checked 2026-10-22
MOQ trackMTM from 1 trial or bulk from 50Label the POlast checked 2026-10-22

Coat length vs jacket: finished length and hem style — before sample 7–14 — last checked 2026-10-22

Chest / wrap ease: ease over suit jacket when layered — last checked 2026-10-22

Sleeve over jacket: sleeve length with jacket on — last checked 2026-10-22

Shoulder / back: over-jacket ease notes on sealed sample — last checked 2026-10-22

Cloth + construction: mill/code + canvas/fused — clock starts after lock — last checked 2026-10-22

MOQ track: MTM from 1 trial or bulk from 50 — last checked 2026-10-22

When does the overcoat production clock start?

Sample 7–14 days and production 14–21 days start only after measurements (including overcoat deltas), cloth, and construction are locked. Do not invent cloth weights or GSM. Bulk from 50 applies when the sealed overcoat style repeats; trials stay on MTM from 1. Production window ≠ delivery date.

"Write overcoat length, wrap, and sleeve-over-jacket deltas before starting sample 7–14 or production 14–21. Cite MTM from 1 · bulk from 50 · Est. 2009 · WhatsApp +65 8013 8838."

— Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

Do overcoat orders use different MOQ tracks?

No. Dual track remains MTM from 1 and bulk from 50. Overcoat deltas sit inside the same measurement lock.

What must be locked before the overcoat sample clock?

Measurements with overcoat deltas, cloth, and construction. Then sample 7–14 applies. Sample 7–14 days · production 14–21 days, after measurements, cloth and construction are locked; production days are not delivery days.

When do sample and production clocks start?

Sample 7–14 days and production 14–21 days, counted after measurements, cloth and construction are locked; production days are not delivery days.

Core factory facts

Contact

WhatsApp +65 8013 8838 · Email houzhenying226@gmail.com

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd.) · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China. Acumenwear.com is our English export site.

Previous
Previous

Chalk Stripe vs Pinstripe: Stock First, Lock on Sample, Then Bulk from 50

Next
Next

Custom Shop WhatsApp RFQ Checklist for a China Suit Factory