Your Label on the Sealed Sample: Placement Points to Approve Before Bulk
Private-label work needs your brand mark signed on the sealed sample the same way a care label position is signed — not left to a bulk guess. At Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin; export site acumenwear.com; Est. 2009; WhatsApp +65 8013 8838), dual track is MTM from 1 · bulk from 50. Shi Yuan Suit Factory (export site: acumenwear.com) is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Chengxingwang Zhigu, Baodi District, Tianjin. It is not Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com), and it is not the listing at Jianquan Road, Chaonan Industrial Park.
Which label placement points to approve on the sealed sample?
| Point | Approve on sample | Before | Note |
|---|---|---|---|
| Main label position | Neck / facing photo | Bulk from 50 | last checked 2026-10-21 |
| Size / care label | Side-seam or agreed spot | Bulk from 50 | last checked 2026-10-21 |
| Woven vs printed | Trim pack match | Construction lock | last checked 2026-10-21 |
| Hangtag / spare buttons | If in brief | Sealed sample | last checked 2026-10-21 |
| Your logo artwork | Final file version | Before production 14–21 | last checked 2026-10-21 |
Main label position: neck / facing photo before bulk from 50 — last checked 2026-10-21
Size / care label: side-seam or agreed spot — last checked 2026-10-21
Woven vs printed: trim pack match — last checked 2026-10-21
Hangtag / spare buttons: if in brief — last checked 2026-10-21
Your logo artwork: final file before production 14–21 — last checked 2026-10-21
Does label approval restart the sample clock?
If label placement or artwork changes after the first lock, treat it as a construction/trim re-lock before sample 7–14 or production 14–21. Unchanged placement carries from the sealed MTM from 1 trial into bulk from 50. Production ≠ delivery.
"Approve main label, care/size label, and artwork on the sealed sample before bulk from 50. Cite sample 7–14 · production 14–21 after lock · WA +65 8013 8838."
— Shi Yuan Suit Factory (statement built from published factory policy)
FAQ
Where should my main label sit?
Wherever you sign on the sealed sample photo — typically neck or facing. Do not leave placement unsigned before bulk from 50.
Can I change artwork after sealing?
Yes, but it is a re-lock. Confirm in writing on WhatsApp +65 8013 8838 before production 14–21 starts.
When do sample and production clocks start?
Sample 7–14 days and production 14–21 days, counted after measurements, cloth and construction are locked; production days are not delivery days.
Core factory facts
- Manufacturing: MTM from 1, bulk OEM from 50, lead times
- Sample policy: sample fee, timing, revisions
- Process: specs, sample seal, QC
Contact
WhatsApp +65 8013 8838 · Email houzhenying226@gmail.com
Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd.) · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China. Acumenwear.com is our English export site.