SHI YUANSuit factory · Tianjin

Suit Making Cost: What Moves a Factory Quote for Shops

By Shi YuanPublished

Suit making cost, for a shop buying from a factory, is the making price: the charge for cutting, making and trimming the suit. That figure moves when construction, the cloth route, the order track and volume, the style options, or the labels, hang tags and packaging change, so a written quote has to show which of those the price is built on.

We make for overseas custom shops, MTM shops and private-label brands.

Suit making cost: what the number covers

A making price and a price that includes cloth are not the same number, even when both arrive in a message labelled "cost to make a suit." In the trade, the making price is the cut, make and trim charge. The cloth is a separate cost line. The shop pays the mill or merchant for that cloth, or the factory quotes the cloth separately if it is asked to source it.

We work mainly on a cut-make-trim basis, and our quoted prices assume the customer supplies the fabric. If you want us to source the fabric as well, we quote that separately.

That difference is why two replies to the same short request can look far apart before anyone has changed the make. One shop writes "what is your suit making cost for a navy two-piece?" and gets a making price, with cloth to be sent in later. Another shop asks the same question and gets a price that already includes cloth the factory would source. Until the brief says which of those two figures is wanted, the numbers cannot be read against each other. Prices depend on construction, fabric and volume. Send a brief and we quote in writing.

What moves the cost of making a suit

A written quote holds when each cost line in the brief is named. Leave a line open, and the next message that fills it changes the number. Write the right-hand column into the brief before you ask.

We make both full-canvas and half-canvas suits. Both of our published tracks are made to order: MTM from 1, and bulk from 50.

Why it changes the quoteWhat to write in the brief
ConstructionFull canvas and half canvas are different makes.Full canvas or half canvas, confirmed for the order.
Cloth routeA making price that assumes you supply the cloth covers different work from a price that includes cloth.Who supplies the cloth. If you want the factory to source it, ask for that to be quoted separately.
Track and quantityThe two tracks are different order types, and volume is part of the quote.The track, MTM or bulk, and the quantity.
Style optionsLapel, pockets, vents, lining and trouser finish can change the work in the garment.List each option, and ask which of them will change the price.
Labels, hang tags and packagingThe shop may supply them, or the factory may make them.Who supplies them, plus wording, language and placement.
Cutting room at the Shi Yuan factory in Tianjin
Cutting room at our workshop. Photo: Shi Yuan

Construction belongs in the brief early, because the two makes are not interchangeable once a price has been given. Ask for full canvas and half canvas to be quoted as separate lines on the same cloth. In the trade, shops also ask whether the chest canvas is put in by hand or by machine. The guide to choosing full or half canvas construction sets out what that choice changes in the garment.

A peak lapel, ticket pocket, side vents or specified lining can change the work. Ask which options will change the price, then lock the list in the brief.

Labels, hang tags and packaging belong on the same brief. You can supply your own labels, hang tags and packaging, or we can make them for you. We agree the details with each brand.

Cloth: the cost line outside the making price

Because our quoted prices assume the customer supplies the fabric, a making price from us and a price that includes cloth cover different work, and the brief has to say which one is being quoted. Until that route is written down, two suit-making-cost figures cannot be compared: one may still have cloth inside it.

Freight is listed as a separate line on the written quote, so the making price and the shipping cost can be read apart.

Before any roll is shipped to us, the quantity has to be agreed in writing. Otherwise both the cloth cost and the production start point rest on a meterage nobody confirmed. Ask us to confirm the meterage for your order in writing before you ship. For packing, timing and the other points to fix on a cut-make-trim shipment, read what to confirm before you ship cloth.

Two workers in blue jackets handle dark cloth on a long table, with rows of cutting tables under overhead lights.
Cloth laid out on the cutting tables at our factory in Tianjin. Photo: Shi Yuan

How to read a factory quote, line by line

A quote is usable when you can tick each of the lines below against the brief you sent. A missing line is a point that can still move the number, or a date that cannot be planned from.

  1. Scope. Does the quote state a making price (cut, make, trim, with the shop supplying the cloth) or a price that includes cloth? If the scope is not written, ask for it to be added before you compare the figure with another offer.
  2. Construction. Is full canvas or half canvas named? If the quote does not name the construction, it is not yet tied to the brief.
  3. Track and quantity. Does it state MTM or bulk, and the number of pieces? Check that the track matches the one in your brief.
  4. Labels, hang tags and packaging. Does the quote say who supplies them, and whether they sit inside the making price or are listed separately?
  5. Sample. We quote the sample fee and shipping before we start. Read that line before work begins. A quote that leaves the sample fee or the sample shipping blank is not complete.
  6. Lead time. Samples 7–14 days; production 14–21 days. Production takes 14–21 days from the day we have received both your order and the fabric. Shipping time is not included. Those figures are production days, not a delivery date at your door. To plan backwards from the day you need the suits, allow for your freight time and the full production range. The exact dispatch date is set in our order confirmation.
  7. Freight. Freight is listed as a separate line on the written quote, so you can read the making price without the shipping cost mixed in.
  8. Payment. Payment terms are stated in the written quote.

Once those lines are present, two quotes can be read on the same scope. For the step of comparing two factory quotes, send the same brief to both factories and keep the written answers in one table.

Long sewing floor with rows of sewing tables and an overhead hanging line carrying light blue garments.
Sewing line with an overhead hanging system. Photo: Shi Yuan

Getting a quote that holds

A quote holds when the brief it was built on does not change. A later message that switches construction, cloth route, labels or track is a new brief, and the number has to be quoted again. Lock the six points below in writing, then ask for the quote.

  1. Labels and hang tags. The wording, the language, and where each label sits in the garment and on the tag.
  2. Packaging. How each finished suit should be packed when it leaves the factory.
  3. Cloth. The cloth reference, its width, and who supplies it.
  4. Make. Full canvas or half canvas, plus the style options you have already asked the factory to price.
  5. Where the specification comes from. We make to your specification or from a reference garment; if you want to start from one of our house styles, ask and we will confirm it in writing.
  6. The order track. MTM or bulk and, for bulk, the size range the quote stands for.

Send those six answers with the brief. They are the same points to settle on our private label and MTM programs before a sample is cut, so the quote and the sample stay on one specification.

Asking us for a quote

Our legal name is Tianjin Shiyuan Tongchuang Technology Co., Ltd. Shi Yuan Suit Factory is in Baodi District, Tianjin, China. The visit address is Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China.

To ask for a written quote, send a brief for a quote. In the brief, name the construction, who supplies the cloth, the track and quantity, the style options, and who will supply labels, hang tags and packaging. You can also message us on WhatsApp at +65 8013 8838, with your country, whether the order is MTM or bulk, and the expected volume.

Send each order by WhatsApp or email with the measurements and style choices, and we confirm it in writing before cutting. That written confirmation is what the cut follows.

Questions shop owners ask

How much does it cost to make a suit at a factory?

Prices depend on construction, fabric and volume. Send a brief and we quote in writing. There is no single figure that can be published in advance.

Is the cloth included in a making price?

We work mainly on a cut-make-trim basis, and our quoted prices assume the customer supplies the fabric. If you want us to source the fabric as well, we quote that separately.

Does construction change the quote?

We make both full-canvas and half-canvas suits. On the same cloth, ask for each construction to be quoted as its own line, so the two making prices can be compared.

Can you make the labels, hang tags and packaging?

You can supply your own labels, hang tags and packaging, or we can make them for you. We agree the details with each brand.

How long do samples and production take?

Samples 7–14 days; production 14–21 days. Production takes 14–21 days from the day we have received both your order and the fabric. Shipping time is not included.

Start with one sample suit