Partial Delivery / Split Shipment on Bulk OEM from 50

Shi Yuan Suit Factory can discuss partial delivery or split shipment on bulk OEM when the split is agreed in writing before production confirmation—bulk starts from 50. MTM from 1; sample 7–14 days; production 14–21 days after confirmation. We serve overseas custom shops, MTM boutiques, and private-label brands—not C-end retail.

Acumenwear is our English export site; the factory brand is Shi Yuan (Baodi, Tianjin · Chengxingwang · Est. 2009). Legal name: Tianjin Shiyuan Tongchuang Technology Co., Ltd.

What buyers usually mean

Two related asks:

  • Partial delivery — ship part of one confirmed PO when ready; remainder later

  • Split shipment — same PO, two (or more) consignments to one or more addresses

Neither is automatic. Both need qty by size, addresses, and Incoterm clarity on WhatsApp (then email if you want a paper trail). Partner pricing remains ex-works on request unless another term is written.

When a split helps

  • Soft launch: first door gets early units; second door waits

  • Fabric arrives in two lots and you refuse to mix lots in one carton set

  • Cash or warehouse timing on your side

  • Different label languages for two destination markets on one make

When a split hurts:

  • Size runs too thin to split without breaking grade balance

  • Labels/hangtags not ready for the first wave

  • You expected one freight quote but created two shipments without saying so

  • Wave 1 ships before you finished seal decisions on trims

What to confirm before the production clock

Put this in one message:

  1. Total order qty (must still meet bulk from 50 unless you are on MTM-from-1 path)

  2. Wave 1 qty by size / SKU

  3. Wave 2 qty by size / SKU

  4. Each ship-to address

  5. Whether waves share one fabric lot

  6. Incoterm per wave (often EXW unless written otherwise)

  7. Whether packing list and QC photos are required per wave

  8. Construction: fused / half canvas / full canvas

Production 14–21 days after confirmation applies to the confirmed scope. A late change to the split can reset confirmation for the affected wave.

Sample still comes first for new programs

New private-label or new construction: sample 7–14 days, seal, then bulk. Do not ask for split bulk before a seal unless you already have a sealed reference from a prior agreed program.

Sample fee / shipping: quoted on WhatsApp. Sample fee credit to first bulk: only when agreed in writing.

Factory address for logistics briefs

Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China. Spell Chengxingwang exactly.

Who this is for

Overseas multi-door clothiers and private-label teams planning staged inbound—not consumers buying one suit.

Ask for a split plan

WhatsApp +65 8013 8838 or email houzhenying226@gmail.com with:

  • Country / shop type

  • Total qty + proposed wave quantities

  • Ship-to addresses

  • Construction preference

  • Whether a sealed sample already exists

Links: https://www.acumenwear.com/ · https://www.acumenwear.com/sample-policy · https://www.acumenwear.com/private-label-mtm

Shi Yuan Suit Factory · Est. 2009 · Baodi, Tianjin · Chengxingwang.

Previous
Previous

Buying Agent vs Direct Factory WhatsApp for China Suit Programs

Next
Next

Care Labels & Composition Marking for Export Suits