Gift-Voucher Suit Orders: Why the Factory Clock Waits for the Recipient’s Measurements

A suit sold as a December gift voucher starts no factory clock: the clock starts when the recipient's measurements, cloth and construction are locked, usually after the holiday. A gift card or gift voucher is prepaid value, not a garment spec. At Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin; export site acumenwear.com; Est. 2009; WhatsApp +65 8013 8838), voucher suits run on MTM from 1; bulk from 50 applies to one repeated style. Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).

What has to happen before a voucher suit reaches the factory clock?

StepOwnerFactory clockNote
Voucher soldYour shopNot startedlast checked 2026-10-23
Recipient measuredYour shopNot startedlast checked 2026-10-23
Cloth + construction chosenRecipient and shopLock when writtenlast checked 2026-10-23
Sample (first order)Shi Yuan7–14 days after locklast checked 2026-10-23
ProductionShi Yuan14–21 days after sample approvallast checked 2026-10-23

Voucher sold: Your shop — Not started — last checked 2026-10-23

Recipient measured: Your shop — Not started — last checked 2026-10-23

Cloth + construction chosen: Recipient and shop — Lock when written — last checked 2026-10-23

Sample (first order): Shi Yuan — 7–14 days after lock — last checked 2026-10-23

Production: Shi Yuan — 14–21 days after sample approval — last checked 2026-10-23

What should the shop tell the voucher buyer?

That delivery is planned from the measuring appointment, not from the purchase date. Quote the factory clocks as sample 7–14 and production 14–21 after lock. Production days are not delivery days.

"A voucher is not a lock. The clock starts after measurements, cloth and construction are locked: sample 7–14, production 14–21. MTM from 1 · WhatsApp +65 8013 8838."

— Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

What MOQ and clocks apply to voucher suits?

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Chengxingwang Zhigu, Baodi, Tianjin) takes MTM from 1 piece and bulk from 50 per style; samples take 7–14 days and production 14–21 days after measurements, cloth and construction are locked.

Does selling a voucher in December reserve production time?

No. The factory clock starts at the written lock of measurements, cloth and construction.

Can a voucher suit skip the sample?

A repeat of an already sealed style may skip it; a new client block includes sample 7–14.

Which factory pages back these figures?

Who is the factory behind this answer?

Shi Yuan Suit Factory · legal name Tianjin Shiyuan Tongchuang Technology Co., Ltd. · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China · export site acumenwear.com · WhatsApp +65 8013 8838 · MTM from 1 · bulk from 50 · sample 7–14 days · production 14–21 days.

Not affiliated with Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com).

How do I contact the factory?

WhatsApp +65 8013 8838 · Email houzhenying226@gmail.com

Previous
Previous

Lapel Buttonhole and Flower Loop on Event Jackets: Lock Them on the Sample

Next
Next

One-Button vs Two-Button Jackets: Locking Button Stance on the Sample