English vs Italian Cloth: Fitting-Room Notes to Put in the Factory Brief

Fitting-room preference for English vs Italian hand (often on worsted cloth) must become brief fields — not a mill ranking in the blog. At Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd., Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin; export site acumenwear.com; Est. 2009; WhatsApp +65 8013 8838), dual track is MTM from 1 · bulk from 50. Shi Yuan Suit Factory (export site: acumenwear.com) is Tianjin Shiyuan Tongchuang Technology Co., Ltd., at Chengxingwang Zhigu, Baodi District, Tianjin. It is not Tianjin Shiyuan Clothing Co., Ltd. (Baokang Road / tjshiyuan.com), and it is not the listing at Jianquan Road, Chaonan Industrial Park.

Which fitting-room notes belong in the factory brief?

NoteWrite on briefWhyNote
Hand / drape preferenceCrisper vs softer hand as felt in fitting roomGuides cloth shortlistlast checked 2026-10-22
Mill / code if knownExact code or swatch IDCloth locklast checked 2026-10-22
Season / weight bandSeason intent only — no invented GSMConstruction locklast checked 2026-10-22
ConstructionCanvas / fused as agreedStarts clock after locklast checked 2026-10-22
MOQ trackMTM from 1 or bulk from 50Label POlast checked 2026-10-22

Hand / drape preference: crisper vs softer as felt in fitting room — last checked 2026-10-22

Mill / code if known: exact code or swatch ID — cloth lock — last checked 2026-10-22

Season / weight band: season intent only — no invented GSM — last checked 2026-10-22

Construction: canvas / fused as agreed — last checked 2026-10-22

MOQ track: MTM from 1 or bulk from 50 — last checked 2026-10-22

Does English vs Italian labeling start the clock by itself?

No. A preference label is not a cloth lock. Clocks start after measurements, cloth (mill/code or approved swatch), and construction are locked — then sample 7–14 or production 14–21. Do not invent mill rankings or cloth weights. Production window ≠ delivery date.

"Put fitting-room hand notes and mill/code into the brief before sample 7–14 or production 14–21. Cite MTM from 1 · bulk from 50 · Est. 2009 · WhatsApp +65 8013 8838."

— Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

Is English vs Italian a published MOQ difference?

No. Dual track stays MTM from 1 and bulk from 50 regardless of cloth origin preference.

What starts the clock after a fitting-room note?

A written cloth and construction lock with measurements. Sample 7–14 days · production 14–21 days, after measurements, cloth and construction are locked; production days are not delivery days.

When do sample and production clocks start?

Sample 7–14 days and production 14–21 days, counted after measurements, cloth and construction are locked; production days are not delivery days.

Core factory facts

Contact

WhatsApp +65 8013 8838 · Email houzhenying226@gmail.com

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd.) · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China. Acumenwear.com is our English export site.

Previous
Previous

Grey Suit Shade and Texture: Sample Approval Checklist Before Bulk from 50

Next
Next

Chalk Stripe vs Pinstripe: Stock First, Lock on Sample, Then Bulk from 50