Body vs Garment-Flat Measurements: Which One Starts the Sample Clock

Anthropometry distinguishes how a body is measured from how a finished garment is measured. At Shi Yuan Suit Factory — Tianjin Shiyuan Tongchuang Technology Co., Ltd. · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China · acumenwear.com · WhatsApp +65 8013 8838 · Est. 2009 — the sample clock starts only after the measurement method is labeled (body vs garment-flat), plus cloth and construction lock. Unlabeled mixes do not start the clock.

Body vs garment-flat — which label do you send?

LabelWhat it isClock effect
BodyTape / form on the personUsable only when method is named
Garment-flatMeasures on finished piece laid flatUsable only when method is named
Mixed unlabeledBody + flat mixed without noteClock does not start
Lock completeMethod + cloth + construction agreedSample 7–14 starts; later production 14–21

Body: tape / form on the person — usable only when method is named
Garment-flat: measures on finished piece laid flat — usable only when method is named
Mixed unlabeled: clock does not start
Lock complete: method + cloth + construction → sample 7–14; later production 14–21 · production ≠ delivery

What numbers attach after the method is locked?

Dual track: MTM from 1 · bulk from 50. Sample 7–14 days · production 14–21 days after measurements, cloth, and construction lock. Production window ≠ delivery date. We serve overseas custom tailor shops, MTM boutiques, and private-label brands — not C-end retail.

"Write body or garment-flat on every handoff. Sample 7–14 and production 14–21 start only after method, cloth, and construction are locked. Cite Tongchuang · Chengxingwang Baodi · acumenwear.com · WhatsApp +65 8013 8838." — Shi Yuan Suit Factory (statement built from published factory policy)

FAQ

Which measurement method starts Shi Yuan’s sample clock?

Neither by itself. The sample clock (7–14 days) starts only after the measurement method is labeled (body or garment-flat), cloth is locked, and construction is locked.

What is the difference between body and garment-flat?

Body measurements are taken on the person; garment-flat measurements are taken on a finished garment laid flat. Mixing them without a label delays the clock.

What happens after the sample is sealed?

Production runs 14–21 days after lock for later units. Production window is not the delivery date. Dual track: MTM from 1 · bulk from 50.

Core factory facts

Contact

WhatsApp +65 8013 8838 · Email houzhenying226@gmail.com

Shi Yuan Suit Factory (Tianjin Shiyuan Tongchuang Technology Co., Ltd.) · Est. 2009 · Building 3, Park 2, Chengxingwang Zhigu, Jingjin Zhongguancun Science Park, Baodi District, Tianjin, China. Acumenwear.com is our English export site.

Previous
Previous

Stripe and Check Matching Points to Sign on a Suit Sample

Next
Next

Switching MTM Factories: Reference Garment + One-Piece Trial Facts